The second meeting of the Forest Hill Pools Stakeholder Group chaired by Cllr Chris Best took place on May 15th. The following notes were taken by Penelope Jarrett of the Forest Hill Society, with some extra info from Annabel McClaren of the Sydenham Society.
The Council website has recently been remodelled to make it easier to follow the story. All relevant documents should be available at this link, which is continuously updated. The stakeholder group will not be the only people consulted. There is also an email group of interested people, and public exhibitions are planned.
The Council has identified £7.5 million from its own internal budgets for the project. This does not rely on government nor any other grants for building.
The project will include housing. They have asked HLM (architects) to look at 3 different scenarios: high, medium and low density housing, with the intention of raising about £2 million. Housing would not be built until the Pools building is finished - unless a high density option were agreed in which case it would be likely to intimately involve the leisure facility building, which would mean it would have to be built at the same time. Construction inflation is about 6% p.a., so the longer the delay in building the less will be got for the sum available. They intend that it be a Council-led project, and so it differs from other Private Finance Initiative projects (PFIs) where they have had commercial partners (e.g. FH school). It is planned that the leisure centre will contain a 25m x 6 lane pool, a learner pool, dry leisure activities, green space and other community facilities.
The rest of the timetable is:
There was some discussion about this last date, as it is later than the timetable discussed previously. On looking at the overall timetable, David Booth could not see why it had been made later. The councillors were not happy about a possible change of completion date. An architect, representing the Laurel Bank residents, felt it was an optimistic timetable.
The group is not fixed, others may join at different times and current members were invited to think if there was anyone else we should be inviting. Suggestions were: representatives from the PCT (re possibility of hydrotherapy for example), and from the local schools who may swim there.
Initially these mainly concerned the timetable, it being felt important that there be no demolition until after consultation on designs. It was also not clear to most of those there why it had to cost so much to maintain an empty building. It was not clear how the promise to consider the design proposal retaining the current Victorian buildings (Louise House and the frontage block of the Pools), raised by a Sydenham Society member, would fit into the overall timetable.
The design brief included consideration of the Urban Design Analysis (as in the Supplementary Planning Guidance for Forest Hill) and the concept of a “gateway” from Forest Hill, continuation of the building line of the library, allowing views of the library, the retention of trees and a green line of approach in front of Kingswear House to the Pools. Most of those present seemed to think these were important considerations. A drawing from HLM was shown to us in confidence, which sparked a lot of discussion. This concerned good and bad aspects of the draft design itself - there are some of each: it very basically fulfils the considerations set out above, and includes the basic pools plus dry leisure and a multi-purpose room, but was only one storey and the frontage seemed untidy, using up a lot of space on a small site. One architect present did not like the frontage. We also discussed how housing might be fitted onto the site, and the possibility of utilising some of the space around Kingswear House, especially at the back of the building. The garages are apparently well used. Could parking be provided elsewhere? There was also discussion of parking around the Pools themselves. Underground car parking is apparently extremely expensive, and on a small site does not save much space because of the access ramps. Apart from disabled parking and coach drop-off for schools (there is already one such site in Thorpewood Avenue), there was some feeling that there should be no or minimal parking to discourage car use. Not everyone thought this feasible.
The officer’s plan seemed to be to ask HLM to come up with 3 designs for high, medium and low density housing, but all based on the draft Pools building presented to us. I asked if it would not be possible to ask the architects to do some different draft drawings, and then ask us which we felt should be worked up in more detail, but the officers seemed to think this was not possible.
Hilary Renwick has the list sent to her by the Forest Hill Society. She said popular items were:
Other thoughts included:
She asked we contact her or Annette Stead with further ideas, or any requests for information.